公翁大龟挺进秀婷小说,国产精品美女久久久久AV,免费人妻精品一区二区三区,久久99精品久久久久婷婷

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請(qǐng)關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.sud-inc.com/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁 > 新聞中心 > 常見問題

木工加工棚的安裝和拆除水平保護(hù)裝置之前做法

來源:http://www.sud-inc.com/   發(fā)布時(shí)間:2022-06-17

木工加工棚是施工過程中操作人員或行人的通道,過往人員的加工棚是雙層的。從懸臂式腳手架的懸臂開始,每隔十米設(shè)置一個(gè)懸臂式加工棚,可以更好地保證人在加工棚下行走的。木工加工棚的安裝和除水平保護(hù)裝置之前做法是怎樣的?
The woodworking shed is a passageway for operators or pedestrians during construction. The processing shed for passing personnel is double-layer. Starting from the cantilever of the cantilever scaffold, a cantilever processing shed is set every ten meters, which can better ensure the safety of the witness walking under the processing shed. What was the practice before the installation of woodworking shed and the removal of Horizontal protective devices?
在安裝和拆除水平保護(hù)裝置之前,請(qǐng)進(jìn)行技術(shù)交底。高空作業(yè)人員經(jīng)過技術(shù)培訓(xùn)和考試,持證上崗。加工棚所用鋼管、扣件等材料符合JGJ130-2011《建筑用扣件式鋼管腳手架技術(shù)規(guī)范》及相關(guān)標(biāo)準(zhǔn)的要求。水平加工棚安裝、拆卸時(shí),操作人員的“三寶”齊全,使用正確。木工加工棚架設(shè)和拆除時(shí),應(yīng)避免上下同時(shí)作業(yè),作業(yè)時(shí)間要錯(cuò)開。
Before installing and removing the horizontal protection device, please conduct safety technical disclosure. The personnel working at heights shall receive professional technical training and professional examination and work with certificates. The steel pipes, fasteners and other materials used in the processing shed shall meet the requirements of jgj130-2011 technical code for safety of steel tubular scaffold with couplers for construction and relevant standards. During the installation and disassembly of the horizontal processing shed, the "three safety treasures" of the operators shall be complete and used correctly. During the erection and removal of the woodworking shed, it shall be avoided to operate up and down at the same time, and the operation time shall be staggered.
木工加工棚
安裝和拆除加工棚時(shí),所有材料和工具應(yīng)堆放在距建筑物外緣少2m的地方,堆放高度不應(yīng)超過1m。拆除的材料應(yīng)及時(shí)運(yùn)地面并運(yùn)走,嚴(yán)禁高空拋擲。施工和拆除加工棚時(shí),應(yīng)在地面設(shè)置警戒區(qū),并指定專人監(jiān)控。搭建和拆除加工棚時(shí),應(yīng)指定專人指導(dǎo)。
When installing and removing the processing shed, all materials and tools shall be stacked at least 2m away from the outer edge of the building, and the stacking height shall not exceed 1m. The removed materials shall be transported to the ground and away in time, and it is strictly prohibited to throw them from high altitude. During the construction and removal of the processing shed, a warning area shall be set on the ground and a special person shall be appointed to monitor it. When setting up and removing the processing shed, a special person shall be appointed for guidance.
管理人員應(yīng)注意眼睛、腿和嘴,并采取有效的防護(hù)措施處理危險(xiǎn)情況,確保人員。陰雨大風(fēng)天氣,應(yīng)暫停加工棚的架設(shè)和拆除,檢查和維護(hù)加工棚的質(zhì)量。加工棚搭建完成后,經(jīng)專職人員驗(yàn)收后方可投入使用。水平保護(hù)架設(shè)和拆除前,應(yīng)進(jìn)行技術(shù)交底。
Management personnel shall pay attention to eyes, legs and mouth, and take effective safety protection measures to deal with dangerous situations to ensure personnel safety. In rainy and windy weather, the erection and removal of the processing shed shall be suspended, and the quality of the processing shed shall be inspected and maintained. After the construction of the processing shed is completed, it can be put into use after being accepted by full-time safety personnel. Before the erection and removal of horizontal protection, safety technical disclosure shall be conducted.
由此我們了解到,在安裝木工加工棚時(shí),一定要注意施工。施工人員應(yīng)按施工要求進(jìn)行施工,同時(shí)保證施工質(zhì)量,達(dá)到保護(hù)的作用,從而達(dá)到我方施工的目的。
From this, we know that we must pay attention to construction safety when installing the woodworking shed. The construction personnel shall carry out the construction according to the construction requirements, ensure the construction quality and achieve the protection effect, so as to achieve the purpose of our construction.
以上就是今天為大家分享的關(guān)于問題的相關(guān)內(nèi)容,希望對(duì)大家能有所幫助,想要了解更多內(nèi)容可以電話聯(lián)系我們或者關(guān)注我們的網(wǎng)站http://www.sud-inc.com。
The above is the relevant content about the problem shared for you today. I hope it can help you. If you want to know more, you can contact us by phone or follow our website http://www.sud-inc.com 。

漂亮人妻被中出中文字幕久久| 草草久久久无码国产专区 | 丰满熟妇无码久久精品国产| 男仆打开双腿让少爷调教| 久久久久久精品无码| 99久久蜜AV毛片毛片正在| 国产精品久久久亚洲| 久久久久久国产精品免费免费男同 | 我帮妺妺洗澡忍不住C了她| 狠狠色噜噜狠狠狠888米奇视频| 成人精品视频99在线观看免费| 韩国午夜理伦三级在线观看中文版 | 国产精品美女一区二区视频 | 我和公发生了性关系视频| 国产成人A∨激情视频厨房| 老扒夜夜春宵第二部的| 99热最新成人国产精品| 国产欧美一区二区三区在线看 | 精品人妻无码区在线视频| 全部孕妇毛片丰满孕妇孕交| 国产成人AV无码一二三区| 欧美成人一区二区三区在线视频| 天天干天天日| 99久久国产精品免费热7788| 色一情一区二区三区四区| 69麻豆天美精东蜜桃传媒| 被调教跪着打屁股| 波多野结衣中文字幕| 女人扒开屁股桶爽30分钟| 色屁屁WWW影院免费观看入口| VIDEOS日本多毛HD护士| 老太爷的春桃乳妓H| 男人扒开添女人下部免费视频 | 少妇BBW搡BBBB搡BBBB| 粉色视频入口| 欧美成人少妇激情视频112| 1000部精品久久久久久久久 | 无码一区二区三区中文字幕| 爆乳3把你榨干哦OVA在线观看| 豆国产96在线 | 亚洲| 欧美午夜精品久久久久免费视|