公翁大龟挺进秀婷小说,国产精品美女久久久久AV,免费人妻精品一区二区三区,久久99精品久久久久婷婷

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請(qǐng)關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.sud-inc.com/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁(yè) > 新聞中心 > 公司新聞

濟(jì)南工地鋼筋加工棚如何搭設(shè)?

來(lái)源:http://www.sud-inc.com/   發(fā)布時(shí)間:2022-03-16

1、木工加工棚工地鋼筋加工棚搭設(shè)規(guī)范:

1. Specification for erection of reinforcement processing shed on site:
鋼筋加工棚是施工現(xiàn)場(chǎng)內(nèi)對(duì)鋼筋進(jìn)行拉直、彎曲、焊接等鋼筋加工作業(yè)的一個(gè)場(chǎng)地。鋼筋加工棚的長(zhǎng)和寬,一般會(huì)根據(jù)鋼筋加工數(shù)量和使用機(jī)械的多少確定加工棚的大小,一般情況有6*12m、9*12m、18*30m等幾種,可以根據(jù)施工實(shí)際情況,自行設(shè)計(jì)長(zhǎng)與寬尺寸。鋼筋加工棚工作臺(tái)的布置也要合理,根據(jù)真實(shí)鋼筋加工流程來(lái),還有加工前原材料鋼筋和加工結(jié)束后成品的存放,所以鋼筋加工棚的地面應(yīng)高于施工場(chǎng)地地面30cm,防止雨水浸泡,用腳手管進(jìn)行搭設(shè)時(shí),應(yīng)有地橫桿和斜撐,以保證加工棚的穩(wěn)定性。
The reinforcement processing shed is a site for straightening, bending, welding and other reinforcement processing operations on the construction site. The length and width of the reinforcement processing shed are generally determined according to the number of reinforcement processing and the number of machines used. Generally, there are 6 * 12M, 9 * 12M, 18 * 30m and other types. The length and width dimensions can be designed according to the actual construction situation. The layout of the worktable of the reinforcement processing shed should also be reasonable. According to the real reinforcement processing process, as well as the storage of raw materials and finished products before processing and after processing, the ground of the reinforcement processing shed should be 30cm higher than the ground of the construction site to prevent rainwater immersion. When erecting with scaffold pipes, there should be ground cross bars and diagonal braces to ensure the stability of the processing shed.
2、工地鋼筋加工棚搭建細(xì)節(jié):
2. Construction details of reinforcement processing shed on site:
埃歐哲鋼筋加工棚采用國(guó)際標(biāo)準(zhǔn)鋼材制作,在現(xiàn)場(chǎng)利用扣件將多根鋼管扣接搭設(shè)成加工棚的整體式鋼結(jié)構(gòu),再設(shè)置斜撐和雙層防砸結(jié)構(gòu),校驗(yàn)鋼結(jié)構(gòu)強(qiáng)度是否符合設(shè)計(jì)要求,在欄桿上鉤掛標(biāo)語(yǔ)橫幅,整個(gè)鋼筋加工棚施工完畢標(biāo)準(zhǔn)化設(shè)計(jì)。全拼裝式,快速組裝,拆卸簡(jiǎn)單,方便運(yùn)輸,型材及配件規(guī)格可按需求來(lái)定制。同時(shí)地面也需要硬化,立柱基礎(chǔ)澆筑700*700*700mm混凝土,預(yù)埋300*300*12mm鋼板。
The eozhe reinforcement processing shed is made of international standard steel. Firstly, a number of steel pipes are buckled and erected on site to form an integral steel structure of the processing shed, and then diagonal bracing and double-layer anti smashing structure are set to verify whether the strength of the steel structure meets the design requirements. Safety slogans and banners are hung on the railings, and the construction of the whole reinforcement processing shed is completed with standardized design. Fully assembled, quick assembly, simple disassembly and convenient transportation. The specifications of profiles and accessories can be customized according to demand. At the same time, the ground also needs to be hardened. The column foundation is poured with 700 * 700 * 700mm concrete and embedded with 300 * 300 * 12mm steel plate.
3、工地鋼筋加工棚需注意事項(xiàng):
3. Precautions for reinforcement processing shed on site:
1.一般情況下,鋼筋加工棚都在塔吊的吊運(yùn)范圍內(nèi),否則鋼筋吊動(dòng)不方便,同時(shí)必須設(shè)置雙層硬質(zhì)防護(hù),棚的具體尺寸要根據(jù)實(shí)際情況來(lái)定。
1. Generally, the reinforcement processing shed is within the lifting range of the tower crane, otherwise it is inconvenient to lift the reinforcement. At the same time, double-layer hard protection must be set, and the specific size of the shed should be determined according to the actual situation.
2.防護(hù)棚的頂有二層的,上面的隔層上鋪模板,下面一層鋪二層竹芭片子,二層之間間距500 mm。
2. If there are two layers on the top of the protective shed, the upper compartment is paved with formwork, and the lower layer is paved with two layers of bamboo flakes, with a spacing of 500 mm between the two layers.
3.工具式鋼筋加工棚需在醒目處掛操作規(guī)程圖牌和宣傳用語(yǔ)的橫幅,圖牌的尺寸為:寬×高=2000mm×1000mm,橫幅寬度宜為1m。
3. The tool type reinforcement processing shed shall hang the operation specification drawing board and the banner of safety publicity language at the eye-catching place. The size of the drawing board is: width × Height = 2000mm × 1000mm, and the width of the banner should be 1m.
4.加工車間地面需硬化,宜選用砼地面。
4. The ground of the processing workshop needs to be hardened, and the concrete ground should be selected.
5.內(nèi)部有滅火器、鋼筋加工設(shè)備、有照明系統(tǒng)
5. There are fire extinguishers, reinforcement processing equipment and lighting system inside
6.加工車間地面需硬化,宜選用砼地面。
6. The ground of the processing workshop needs to be hardened, and the concrete ground should be selected.
7. 南方地區(qū),如遇臺(tái)風(fēng)應(yīng)采取防風(fēng)措施,可設(shè)置纜風(fēng)繩
7. In the south, in case of typhoon, windproof measures shall be taken, and wind ropes can be set

亚洲国产另类久久久精品黑人 | 无码少妇高潮浪潮AV久久| 成人无码H免费动漫在线观看| 50岁退休熟女露脸高潮| 免费国产黄网站在线观看视频| 一本一道精品欧美中文字幕| 欧美XXXXX高潮喷水| 久久亚洲精品中文字幕| 无码AV天堂一区二区三区| 国产女人高潮嗷嗷嗷叫| 公和我做爽死我死了A片在线| 日韩精品无码中文字幕一区二区 | 做床爱30分钟免费观看| 国精品无码一区二区三区左线| 亚洲色欲色欲WWW在线成人网| 无码人妻精品一区二区蜜桃色| 欧美熟妇呻吟猛交XX性| 护士的小嫩嫩好紧好爽| 无码一区二区三区中文字幕 | 把老师的批日出水了视频| 国产精品久久久久精品| 给我免费播放片高清在线观看 | 99久久精品无码一区二区毛片| 精品一区二区三区免费毛片W| 麻豆亚洲AV成人无码久久精品| 亚洲熟妇丰满多毛XXXX| 国产产无码乱码精品久久鸭| 蜜臀AV人妻国产精品| 日日AV夜夜添久久奶无码| 巨粗进入警花哭喊求饶| 亚洲AV无码乱码国产麻豆| 中文字幕精品亚洲无线码二区| 艳鉧动漫1~6全集在线观看| 夜夜性日日交XXX性HD| 日本欧美大码一区二区免费看| GOGO西西人体大尺寸大胆高清| 娇妻被别人调教成公用| 工头搡老女人老妇女老熟女| 短篇公交车高H肉辣全集目录 | 中老年妇女加肥加大女上衣| 多P混交群体交乱嗯啊小说|