欧美大屁股xxxx,国产成人无码免费看片软件,国产小受呻吟GV视频在线观看 ,真人做人试看60分钟免费视频

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請(qǐng)關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://sud-inc.com/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁(yè) > 新聞中心 > 公司新聞

施工鋼筋加工棚的作用及相關(guān)案例

來(lái)源:http://sud-inc.com/   發(fā)布時(shí)間:2022-07-19

施工鋼筋加工棚是在木工加工場(chǎng)地、鋼筋加工場(chǎng)地等上方有可能掉落物件或處于起重機(jī)調(diào)桿回轉(zhuǎn)范圍之內(nèi),應(yīng)搭設(shè)雙層防護(hù)棚。施工鋼筋加工棚就是施工現(xiàn)場(chǎng)保護(hù)施工人員,用鋼管作為支撐骨架,上面覆蓋竹串片或者竹笆板或者廢模板作為防砸,或者保護(hù)防護(hù)棚內(nèi)經(jīng)過(guò)的諸如高壓線之類的東西,一般的雙層防護(hù)是為了加大系數(shù)。
The construction reinforcement processing shed is above the woodworking processing site and reinforcement processing site, where objects may fall or are within the rotation range of the crane adjusting rod. A double-layer protective shed should be set up. The construction reinforcement processing shed is to protect the construction personnel at the construction site, use steel pipes as the support framework, and cover bamboo strips or bamboo fence boards or waste templates as anti smashing, or protect things such as high-voltage lines passing through the protective shed. The general double-layer protection is to increase the safety factor.
施工鋼筋加工棚長(zhǎng)和寬尺寸,要根據(jù)鋼筋加工數(shù)量和使用機(jī)械的多少確定加工棚的大小,一般情況有6*9m、6*12米、9*12m等幾種,可以根據(jù)實(shí)際情況酌情采用,也可自行設(shè)計(jì)長(zhǎng)寬尺寸。
The length and width of the construction reinforcement processing shed should be determined according to the number of reinforcement processing and the number of machines used. Generally, there are 6*9m, 6*12m, 9*12m and so on, which can be adopted according to the actual situation, or the length and width can be designed by ourselves.
同時(shí),現(xiàn)場(chǎng)鋼筋加工棚一般需根據(jù)施工籌備計(jì)劃,安置鋼筋對(duì)焊機(jī)、切斷機(jī)、彎曲機(jī)、調(diào)直機(jī)等設(shè)備的數(shù)量及加工流水線;另還需考慮部分鋼筋原材料、加工后鋼筋的周轉(zhuǎn)及堆放;現(xiàn)場(chǎng)施工場(chǎng)地、用電等條件來(lái)確定;故鋼筋加工棚一般跨度在12~18m,,長(zhǎng)度盡可能大于30m。
At the same time, the reinforcement processing shed on site generally needs to arrange the number of reinforcement butt welding machines, cutting machines, bending machines, straightening machines and other equipment and processing lines according to the construction preparation plan; In addition, it is also necessary to consider the turnover and stacking of some reinforcement raw materials and processed reinforcement; On site construction site, electricity and other conditions; Therefore, the reinforcement processing shed generally has a span of 12~18m and a length of more than 30m as far as possible.
鋼筋加工棚
Reinforcement processing shed case:
立柱:采用150mmX150mmX3mm方鋼管,中心間距4.15m,立柱焊接滿焊地面預(yù)埋鋼板上,立柱高3.2m,鋼筋棚立柱用方鋼管噴涂雙色漆,底漆使用防銹漆一遍,面漆使用黃、黑兩種漆,自底部刷黑漆,向上每間隔50cm交替使用黃、黑漆,共刷兩遍。
Column: 150mmx150mmx3mm square steel pipe is used, with a center spacing of 4.15M. The column is fully welded to the ground embedded steel plate, and the column height is 3.2m. The column of the reinforcement shed is sprayed with two-color paint with square steel pipe, one coat of antirust paint is used for the primer, and two coats of yellow and black paint are used for the finish. Black paint is applied from the bottom, and yellow and black paint are applied alternately every 50cm upward, a total of two coats.
支架:橫向采用40mmX60mmX3.5mm方鋼管,跨度12m(兩端各懸挑1m),與立柱焊接,支架與立柱斜撐使用40mmX60mm方鋼管連接,支架與屋頂脊梁連接使用40mmX60mmX3.5mm方鋼管,支架底漆使用防銹漆--遍,面漆使用鐵紅漆兩遍。
Support: 40mmx60mmx3.5mm square steel pipe is used horizontally, with a span of 12m (1m overhanging at both ends). It is welded with the column. 40mmx60mm square steel pipe is used to connect the support with the column diagonal brace, 40mmx60mmx3.5mm square steel pipe is used to connect the support with the roof ridge, antirust paint is used for the primer of the support, and iron red paint is used for the surface paint twice.
脊梁:橫向采用40mmX60mmX3.5mm方鋼管,與立柱、支架焊接,并兩端做懸挑,懸挑長(zhǎng)度20cm??v向采用C型鋼50mmX80mm,共11道,刷漆兩道,底漆使用防銹漆-遍,面漆使用鐵紅漆兩遍。
Spine: 40mmx60mmx3.5mm square steel pipes are used horizontally, welded with columns and supports, and cantilever is made at both ends, with a cantilever length of 20cm. C-shaped steel 50mmx80mm is used longitudinally, a total of 11 courses, two coats of paint, one coat of antirust paint for primer and two coats of iron red paint for finish.
施工鋼筋加工棚的作用及相關(guān)案例的問(wèn)題就講解完畢了,您有需求或者有問(wèn)題的話可關(guān)注我們網(wǎng)站http://sud-inc.com隨時(shí)來(lái)向在線客服咨詢了解。
The role of the construction reinforcement processing shed and the problems of relevant cases are explained. If you have needs or problems, you can follow our website http://sud-inc.com Feel free to consult online customer service.

JAPANESE高潮流白浆| 阿娇被躁120分钟视频| 九九久久精品无码专区| 军人全身脱精光自慰| 精品人妻系列无码人妻漫画 | 亚洲精品乱码久久久久久蜜桃图片 | 丰满人妻被黑人猛烈进入 | 美女裸露双奶头屁股无遮挡裸体| 精品久久久久久久无码人妻热| 地瓜视频app免费观看下载| chinesevideo国产熟妇| 免费中国帅气体育生gary| 艳mu无删减在线观看免费无码| 女人与公拘交酡全过程 | 亚洲人成色777777精品| 国产SUV精二区九色| 亚洲 欧美 自拍 第15页| 朋友的丰满人妻HD中文| 免费看国产曰批40分钟视频网站 | 久久日本片精品AAAAA国产| 男男车车的车车网站w98免费 | 与子敌伦刺激对白亂輪亂性 | 免费无码国产V片在线观看| 精品国产天线2019| 日韩精品视频一区二区三区 | 国产香蕉97碰碰久久人人| 锕锕锕锕锕锕~太深了视频| 无码精品A∨在线观看中文| 班长撕开乳罩揉我胸好爽| 免费观看性生交大片| 香蕉久久久久久AV成人| 风韵丰满熟妇啪啪区老熟熟女| 图片 小说 校园 激情 都市| 特大BBWBBWBBW高潮| 国产韩国精品一区二区三区| 国精品无码一区二区三区在线蜜臀| 久久国产精品亚洲婷婷A片| 校花内裤被涂满了强烈春药| 亚洲欧美国产日韩AV野草社区| 欲妇荡岳丰满交换| 国内熟女精品熟女A片视频小说|