木工加工棚的規(guī)范搭設(shè)做法有哪些?
來源:http://www.sud-inc.com/ 發(fā)布時(shí)間:2022-09-07
木工加工棚是建筑工地上常用的設(shè)施,給建筑工程帶來很大的便利,正確搭建規(guī)范的加工棚非常重要。下面,我們跟廠家來詳細(xì)了解加工棚的規(guī)范做法。希望以下內(nèi)容對您能有幫助。
Woodworking shed is a common facility on construction sites, which brings great convenience to construction projects. It is very important to correctly build a standardized processing shed. Next, we will learn more about the standard practices of the processing shed from the manufacturer. I hope the following contents can help you.
當(dāng)臨街通道、場內(nèi)通道、出入建筑物通道、施工電梯及物料提升機(jī)地面進(jìn)料口作業(yè)通道處于墜落半徑內(nèi)或處于起重機(jī)起重臂回轉(zhuǎn)范圍內(nèi)時(shí),設(shè)置加工棚及防護(hù)通道,以避免發(fā)生物體打擊事故。
When the street side passage, the on-site passage, the passage to and from the building, the operation passage of the construction elevator and the ground feed inlet of the material elevator are within the falling radius or within the slewing range of the crane jib, the processing shed and the protective passage shall be set up to avoid the occurrence of biological strike accidents.
防護(hù)通道、加工棚應(yīng)采用建筑鋼管扣件腳手架或其他型鋼材料搭設(shè),嚴(yán)禁采用竹木桿件搭設(shè)加工棚。
The protective passage and processing shed shall be erected with scaffold of building steel pipe fastener or other profile steel materials. It is forbidden to erect processing shed with bamboo and wood rods.
防護(hù)通道及加工棚的頂部嚴(yán)密鋪設(shè)雙層正交竹串片腳手板或雙層正交18厚木模板的水平硬質(zhì)防護(hù),及封閉的防護(hù)欄或擋板,整體應(yīng)能承受10kPa的均布靜荷載。塔吊主要經(jīng)行線路、轉(zhuǎn)料平臺、卸料平臺落物曲線范圍內(nèi)的防護(hù)通道及加工棚頂部嚴(yán)密鋪設(shè)雙層正交50厚木板。
The top of the protection channel and processing shed shall be tightly paved with double-layer orthogonal bamboo string piece scaffold board or double-layer orthogonal 18 thick wood formwork for horizontal hard protection, as well as closed protective fence or baffle, which shall be able to withstand a uniform static load of 10KPA as a whole. The tower crane mainly passes through the protective passage within the falling curve of the line, transfer platform and unloading platform, and the top of the processing shed is tightly laid with double-layer orthogonal 50 thick wood plates.
特別重要或大型的防護(hù)通道、加工棚及懸挑式防護(hù)設(shè)施制定專項(xiàng)技術(shù)方案,經(jīng)企業(yè)技術(shù)負(fù)責(zé)人審批后實(shí)施。
Special technical schemes shall be formulated for particularly important or large protective passages, processing sheds and cantilevered protective facilities, which shall be implemented after being approved by the technical director of the enterprise.
防護(hù)通道凈空高度和寬度應(yīng)根據(jù)通道所處位置及人、車通行要求確定,高度一般不低于3.5m,寬度一般不低于3m。高度在15m以下建筑物,其進(jìn)出口通道長度不低于3m;高度在15-30m的建筑物,其進(jìn)出口通道長度不低于4m,高度超過30m的建筑物,其進(jìn)出口通道長度不低于5m。
The clearance height and width of the protection channel shall be determined according to the position of the channel and the requirements for the passage of people and vehicles. Generally, the height shall not be less than 3.5m and the width shall not be less than 3m. For buildings with a height of less than 15m, the length of inlet and outlet channels shall not be less than 3m; For buildings with a height of 15-30m, the length of the inlet and outlet channels shall not be less than 4m; for buildings with a height of more than 30m, the length of the inlet and outlet channels shall not be less than 5m.
通道長度自腳手架外排立桿起算。立桿基礎(chǔ)硬化處理,通道使用期內(nèi)不得發(fā)生地面沉陷,立桿沿通行方向通長設(shè)置掃地桿和剪刀撐。常規(guī)防護(hù)通道立桿縱距不應(yīng)超過1200mm,加工棚懸挑尺寸為300~500mm,雙層加工棚層間距為500~600mm。
The length of the passage is calculated from the outer row of the scaffold. The foundation of the upright pole shall be hardened, and the ground shall not sink during the service life of the passage. The upright pole shall be provided with a sweeping pole and cross bracing along the whole length of the passage direction. The longitudinal distance between the vertical poles of the conventional protection channel shall not exceed 1200mm, the overhanging size of the processing shed shall be 300-500mm, and the interval between the layers of the double-layer processing shed shall be 500-600mm.
以上內(nèi)容是廠家為大家介紹的關(guān)于加工棚規(guī)范做法,如果您不了解這個(gè)問題,可以參考文中講述的內(nèi)容,或者和我們聯(lián)系http://www.sud-inc.com,我們可以為您提供詳細(xì)的解答和產(chǎn)品服務(wù)。
The above content is about the standard practice of processing shed introduced by the manufacturer. If you don't understand this problem, you can refer to the content in the text or contact us http://www.sud-inc.com , we can provide you with detailed answers and product services.
- 上一篇:施工地圍擋的使用警示要求
- 下一篇:彩鋼圍擋的特性以及應(yīng)用注意