欧美大屁股xxxx,国产成人无码免费看片软件,国产小受呻吟GV视频在线观看 ,真人做人试看60分钟免费视频

濟南蓬發(fā)建材有限公司為您提供臨邊護欄、木工防護欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機: 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://sud-inc.com/

地址:山東省濟南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁 > 新聞中心 > 行業(yè)動態(tài)

鋼筋加工棚的8點安裝事項

來源:http://sud-inc.com/   發(fā)布時間:2023-02-17

鋼筋加工棚是施工現(xiàn)場鋼筋調(diào)直、彎曲和焊接的場所。鋼筋加工棚我們來看看是怎么裝的。
The reinforcement processing shed is the place for reinforcement straightening, bending and welding at the construction site. Let's see how to install the reinforcement processing shed.
1、埋設(shè)預(yù)埋件(預(yù)埋件包含在單柱鋼棚內(nèi),雙柱安裝使用膨脹螺絲)
1. Embedded parts (embedded parts are included in single-column steel shed, and expansion screws are used for double-column installation)
2、將主梁與立柱連接器對接,(不要擰14個螺絲),鋼筋加工棚先將斜撐安裝在上斜撐上(用14個螺絲)。否則,支架的孔沒有對齊。
2. Connect the main beam with the column connector (do not tighten 14 screws), and install the diagonal brace on the upper diagonal brace (use 14 screws) in the reinforcement processing shed. Otherwise, the holes of the bracket are not aligned.
3、安裝主梁(單柱主梁為140工字鋼和50方管焊接框架,雙柱主梁為50方管焊接框架)與柱之間的連接件(14個螺釘)。
3. Install the connections (14 screws) between the main beam (140 I-beam and 50 square tube welded frame for single-column main beam, and 50 square tube welded frame for double-column main beam) and the column.
4、用叉車或吊車將立柱吊起安裝,間距3米(單柱單柱為200工字鋼,雙柱為100方管)。鋼筋加工棚安裝時,確保立柱的腰線在中間3米。方管柱底盤通過20*180膨脹螺栓與預(yù)埋件連接,H型鋼柱。
4. Use a forklift or crane to lift and install the columns with a spacing of 3 meters (single column and single column are 200 I-beams, and double columns are 100 square tubes). When installing the reinforcement processing shed, ensure that the waist line of the column is 3 meters in the middle. The square pipe column chassis is connected with the embedded parts through 20 * 180 expansion bolts, and H-shaped steel column.
鋼筋加工棚
5、安裝側(cè)梁(50方管焊接框架),兩邊用10×12螺釘,中間用10×18螺釘。
5. Install the side member (50 square tube welded frame) with 10 on both sides × 12 screw, 10 in the middle × 18 Screw.
6、安裝檁條,底層6個2.99米鉆尾,鋼筋加工棚4個2.94米夾角鐵,裝上。
6. Install purlins, six 2.99m drilled tails at the bottom, and four 2.94m angle iron clips at the top of the reinforcement processing shed, and install them.
7、設(shè)置彩鋼屋面,彩鋼板尺寸為1.14*3.0米,中間每隔3米,在柱的左右兩側(cè)放置三塊彩鋼板,鋼筋加工棚彩鋼板通過鉆尾絲與下檁條連接。
7. The color steel roof is set. The size of the color steel plate is 1.14 * 3.0m, and three color steel plates are placed on the left and right sides of the column every 3m in the middle. The color steel plate of the reinforcement processing shed is connected with the lower purlin through the drilling tail wire.
8、四面安裝廣告布,用鉆尾絲打邊梁和主梁。
8. Install advertising cloth on all sides, and punch the side beam and main beam with drilling thread.
鋼筋加工棚的施工規(guī)范是日常建筑施工中必不可少的。這種規(guī)范可以給我們帶來放心,保證建筑的牢固性。更多相關(guān)內(nèi)容就來我們網(wǎng)站http://sud-inc.com咨詢!
The construction specification of reinforcement processing shed is indispensable in daily construction. This kind of specification can give us reassurance and ensure the firmness of the building. Come to our website for more relevant content http://sud-inc.com consulting service

无码日韩人妻精品久久蜜桃入口 | 日本免费无码一区二区到五区 | 亚洲欧美婷婷五月色综合| 少妇和大狼拘作爱a片| 亚洲AV日韩AV永久无码色欲| 18禁高潮出水呻吟娇喘蜜芽| 国产99久久久国产精品潘金莲| 中国妇被黑人XXX猛交| 天天躁日日躁狠狠躁AV麻豆| 性一交一乱一乱一视频| 午夜精品久久久久久久99热蜜桃| 亚洲精品乱码久久久久久蜜桃图片| 天干夜天干天天天爽视频| 久久午夜无码鲁丝片午夜精品| 护士趴下光屁股翘臀被打的作文| 日本SM/羞辱/调教/捆绑视频| 亚洲国产精品无码久久久老少| 国产精品视频一区二区| 精品久久久久国产免费| 51国产偷自视频区视频| 国产精品理论片在线观看| 罚女仆夹震蛋器憋尿虐乳网站| 欧美日韩国产精品| 日日碰狠狠躁久久躁| 曰批国产精品视频免费观看| 国产精品毛片一区二区| 亚洲精品国精品久久99热| 女人被老外躁得好爽免费视频| 国产aⅴ激情无码久久久无码| 国偷自产一区二区免费视频| 一本色道久久99一综合| 成人免费无遮挡无码黄漫视频| 熟妇高潮一区二区三区| 天干天干天夜夜爽啪啪免费网站| 最近中文字幕视频2019一页 | 性生生活20分钟免费| 中文字幕精品亚洲无线码二区| 中文字幕人妻丝袜二区| 日韩精品无码一区二区三区| 成人电影免费在线观看| 日韩精品久久久久久免费|