公翁大龟挺进秀婷小说,国产精品美女久久久久AV,免费人妻精品一区二区三区,久久99精品久久久久婷婷

濟南蓬發(fā)建材有限公司為您提供臨邊護欄、木工防護欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機: 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.sud-inc.com/

地址:山東省濟南市章丘圣井工業(yè)園

臨邊護欄防護作業(yè)操作的事項介紹

來源:http://www.sud-inc.com/   發(fā)布時間:2024-03-13

在臨邊護欄作業(yè)施工時重要的是,大于一切,但盡管三令五申強調(diào)作業(yè),但還是有很多企業(yè)違反規(guī)定沒有按照政策去施工,導(dǎo)致了生產(chǎn)問題時有發(fā)生,給和社會造成很大損失。因此頒布臨邊洞口作業(yè)施工標準規(guī)范工地操作施工,這是繼91年標準后2016年新的基本規(guī)定。

When working on edge guardrails, it is important to prioritize safety. Safety is paramount. Despite the country's repeated emphasis on safe operations, many enterprises still violate regulations and fail to follow national policies, resulting in frequent safety production issues and causing significant losses to the country and society. Therefore, the country has issued construction standards for edge opening operations to regulate the safe operation and construction of construction sites, which is a new basic regulation in 2016 following the 91 year standard.

1 建筑施工中凡涉及臨邊與洞口作業(yè)、攀登與懸空作業(yè)、操作平臺、交叉作業(yè)及網(wǎng)搭設(shè)的,應(yīng)在施工組織設(shè)計或施工方案中制定高處作業(yè)技術(shù)措施。

For construction involving edge and hole operations, climbing and suspended operations, operating platforms, cross operations, and safety net installation, safety technical measures for high-altitude operations should be formulated in the construction organization design or construction plan.

2 高處作業(yè)施工前,應(yīng)按類別對防護設(shè)施進行檢查、驗收,驗收合格后方可進行作業(yè),并應(yīng)做驗收記錄。驗收可分層或分階段進行。

20230315030529840.jpg

Before carrying out high-altitude operations, safety protection facilities should be inspected and accepted according to their categories. Only after passing the acceptance can operations be carried out, and acceptance records should be kept. Acceptance can be carried out in layers or stages.

3 高處作業(yè)施工前,應(yīng)對作業(yè)人員進行技術(shù)交底,并應(yīng)記錄。應(yīng)對初次作業(yè)人員進行培訓。

Before carrying out high-altitude operations, safety technical briefing should be conducted to the workers and recorded. Training should be provided to first-time workers.

4 應(yīng)根據(jù)要求將各類警示標志懸掛于施工現(xiàn)場各相應(yīng)部位,夜間應(yīng)設(shè)紅燈警示。高處作業(yè)施工前,應(yīng)檢查高處作業(yè)的標志、工具、儀表、電氣設(shè)施和設(shè)備,確認其完好后,方可進行施工。

4. Various safety warning signs should be hung at the corresponding parts of the construction site according to requirements, and red lights should be set up for warning at night. Before carrying out high-altitude operations, safety signs, tools, instruments, electrical facilities, and equipment for high-altitude operations should be checked and confirmed to be in good condition before construction can proceed.

5 高處作業(yè)人員應(yīng)根據(jù)作業(yè)的實際情況配備相應(yīng)的高處作業(yè)防護用品,并應(yīng)按規(guī)定正確佩戴和使用相應(yīng)的防護用品、用具。

5. High altitude workers should be equipped with corresponding safety protection equipment according to the actual situation of the work, and should correctly wear and use the corresponding safety protection equipment and tools according to regulations.

6 對施工作業(yè)現(xiàn)場可能墜落的物料,應(yīng)及時拆除或采取固定措施。高處作業(yè)所用的物料應(yīng)堆放平穩(wěn),不得妨礙通行和裝卸。工具應(yīng)隨手放入工具袋;作業(yè)中的走道、通道板和登高用具,應(yīng)隨時清理干凈;拆卸下的物料及余料和廢料應(yīng)及時清理運走,不得隨意放置或向下丟棄。傳遞物料時不得拋擲。

6 pairs of materials that may fall on the construction site should be promptly removed or fixed measures taken. The materials used for high-altitude operations should be stacked steadily and not obstruct passage and loading and unloading. Tools should be easily placed in a tool bag; The walkways, walkways, and high-altitude equipment used in homework should be cleaned at all times; The dismantled materials, surplus materials, and waste materials should be cleaned and transported away in a timely manner, and should not be arbitrarily placed or discarded downwards. Do not throw materials during transfer.

7 高處作業(yè)應(yīng)按現(xiàn)行標準《建設(shè)工程施工現(xiàn)場消防技術(shù)規(guī)范》GB 50720的規(guī)定,采取防火措施。

7. Fire prevention measures should be taken for high-altitude operations in accordance with the current national standard GB 50720 Technical Code for Fire Safety at Construction Sites.

8 在雨、霜、霧、雪等天氣進行高處作業(yè)時,應(yīng)采取防滑、防凍和防雷措施,并應(yīng)及時作業(yè)面上的水、冰、雪、霜。當遇有6級及以上強風、濃霧、沙塵暴等惡劣氣候,不得進行露天攀登與懸空高處作業(yè)。雨雪天氣后,應(yīng)對高處作業(yè)設(shè)施進行檢查,當發(fā)現(xiàn)有松動、變形、損壞或脫落等現(xiàn)象時,應(yīng)立即修理完善,維修合格后方可使用。

When working at heights in rainy, frosty, foggy, snowy or other weather conditions, anti slip, anti freezing, and lightning protection measures should be taken, and water, ice, snow, and frost should be promptly removed from the work surface. When encountering severe weather conditions such as strong winds of level 6 or above, dense fog, and sandstorms, outdoor climbing and suspended high-altitude operations are not allowed. After rainy and snowy weather, safety facilities for high-altitude operations should be inspected. If any looseness, deformation, damage or detachment are found, they should be repaired and improved immediately. Only after passing the repair can they be used.

9 對需臨時拆除或變動的防護設(shè)施,應(yīng)采取可靠措施,作業(yè)后應(yīng)立即恢復(fù)。

Reliable measures should be taken for safety protection facilities that need to be temporarily dismantled or changed, and they should be restored immediately after operation.

本文由工地圍擋提供幫助,更多的相關(guān)內(nèi)容請點擊http://www.sud-inc.com希望本文能夠為您帶來幫助,感謝您的閱讀!

This article is provided by the construction site fence for assistance. For more related content, please click on http://www.sud-inc.com I hope this article can be helpful to you. Thank you for reading!

曰本女人与公拘交酡视频| 色一情一乱一伦一区二区三区日本 | 久久久WWW成人免费毛片| 双XING挨CAO日常美人多汁| 国产亚洲精品久久777777| 熟妇少妇任你躁在线无码| 国产婷婷成人久久AV免费高清 | 极品粉嫩国产18尤物在线播放| 男人J桶进女人P无遮挡全过程| 欧美性猛交XXXX黑人| 全职法师第6季全集免费观看| 欧美成人片一区二区三区| 全肉变态重口调教高辣小说| 无码国产精品久久一区免费| 久久精品国产一区二区三| 做床爱30分钟免费观看| 寡妇张开腿让黑人捅爽| 国色天香精品一卡2卡3卡| 亚洲欧美婷婷五月色综合| 扒开腿狂躁女人爽出白浆| 高H短篇辣肉各种姿势自慰H | 国产精品久久久久久吹潮| 日本边添边摸边做边爱的视频| 巨肉黄暴辣文高H文| 欧美午夜精品一区二区蜜桃| 中国美女撒尿TXXXX视频偷窥| 末成年女AV片一区二区| 亚洲午夜精品久久久久久浪潮| 狠狠色噜噜狠狠狠狠97首创麻豆 | 少妇大叫太大太粗太爽了A片| 小粉嫩精品A片在线视看| 亚洲熟妇无码AV无码| 女人张开腿让男桶喷水高潮| 金鸽源赛鸽公棚春棚| 国产XXXX搡XXXXX搡| 伊人久久精品一区二区三区| 国精品人妻无码一区二区三区牛牛| 无人区一码二码三码四码区| 第一次破学生处视频免费观看| 国产精品扒开腿做爽爽爽| 97在线 | 亚洲|